Identifying factors causing cost overrun of hotel construction projects in Sri Lanka

By: Ramnukkana, CD
Material type: TextTextLanguage: English Language Publisher: Rathmalana KDU 2020Description: xi,51 p. CDSubject(s): Impact of designing | Economic impact | Procedural issues | Resource constrained | Effect if schedulingDissertation note: KDU Faculty of Graduate Studies Management
    Average rating: 0.0 (0 votes)
Item type Current location Home library Collection Call number Status Date due Barcode Item holds
Permanent  Reference Materials Permanent Reference Materials Main Library
Main Library
Theses and Dissertations Collection Not for loan MSc 00289
Total holds: 0

KDU Faculty of Graduate Studies Management MSc. 2020 MSc/M/13/44 KDU

There are no comments on this title.

to post a comment.
 

Powered by Koha